Safe Work Method Statements (SWMS)
12 min! Run Time
Employees
only
of Completion
Friendly
Access
What you'll learn
Description
A successful hazard management program involves hazard identification, assessment of the risks, and the implementation of control measures. A hugely important tool in the workplace is the Safe Work Method Statement (SWMS) which is used for looking at the work task and considering what is the safest way to complete it. This SWMS course details the importance of the SWMS document and how to fill it out. It is a vital component of a workplace health and safety program.
Once the course is completed, you will know when and why an SWMS should be used, how it should be completed, and who should be involved in the preparation of the document. This course is one part of a 36-part Induction Series aimed at blue-collar workers.
System Requirements
See System Requirements in the Coggno Knowledge Base
Safe Work Method Statements (SWMS)
Frequently Asked Questions
OSHA Compliance
- Bloodborne Pathogens Training (21)
- Electrical Safety (73)
- Fire Safety Training (50)
- First Aid Training (34)
- Forklift Training (45)
- HazCom (Hazard Communication) (51)
- Lockout/Tagout (LOTO) (24)
- OSHA 10 Hour Training (6)
- OSHA 30 Hour Training (2)
- PPE (Personal Protective Equipment) (65)
- Slips, Trips & Falls (72)
- Workplace Safety (1001)