Campus Safety: Fire, Safety, and Health Requirements for Spray-Finishing Operations (IACET CEU=0.1)
1h! Run Time
Employees
only
of Completion
Friendly
Access
What you'll learn
Description
This Campus Safety: Fire, Safety, and Health Requirements for Spray-Finishing Operations (IACET CEU=0.1) Course provides an overview of key fire, safety, and health requirements associated with paint spray booths and spray-finishing operations. In this training, we will be focusing much of our time on the fire safety regulations published by NFPA and relevant OSHA requirements for employee safety. Participants will learn about some of the potential physical and health hazards associated with spray-finishing operations through real-world examples and other relevant sources.
Requirements for booth construction, electrical equipment, the handling of flammable and combustible liquids, operations and maintenance, ventilation, electrostatic finishing tools, and protective equipment and hygiene are all listed and discussed. The course also introduces some of the guidelines for training individuals who use spray operation equipment.
System Requirements
See System Requirements in the Coggno Knowledge Base
Table of Contents
Spray Booth Health & Physical Hazards
Detailed Review of Relevant Standards
Spray Booth Construction
Electrical Equipment and Components
Flammable and Combustible Liquids
Spray Booth Operations and Maintenance
Ventilation
Electrostatic Apparatus
Personal Protective Equipment (PPE) and Personal Hygiene Training
Campus Safety: Fire, Safety, and Health Requirements for Spray-Finishing Operations (IACET CEU=0.1)
Frequently Asked Questions
OSHA Compliance
- Bloodborne Pathogens Training (21)
- Electrical Safety (73)
- Fire Safety Training (50)
- First Aid Training (34)
- Forklift Training (45)
- HazCom (Hazard Communication) (51)
- Lockout/Tagout (LOTO) (24)
- OSHA 10 Hour Training (6)
- OSHA 30 Hour Training (2)
- PPE (Personal Protective Equipment) (65)
- Slips, Trips & Falls (72)
- Workplace Safety (1001)